Photos taken today, Friday (Sept. 13). The forms at top have moved up a level, I think we are at level 70 at the core. At 69 for sure. As documented by BloorMan above, the latest set of hangers were installed yesterday linking the corner floors of level 59 to the top of level 64. These are the 10th set of hangers, the first set of three for the third mega-section, as I call the sections between the mechanical floors. One section below, the west Rail Climbing System has joined the east and north ones, installing the skin on level 39, the first floor of the second mega-section. How come I never realized until now that there are exactly 20 floors between each mega-section? Meanwhile, at ground level nothing new to report as we wonder if a retail tenant will move in there soon.

Starting with the latest "time-lapse" Flickr album update (I also now include the view from Cumberland by Bay in that album to better see the top of the tower rising), to the view from Yonge and Dundas to the south, a closer view from Yonge and Alexander showing the top half of the tower and tighter shot from below, then to shots looking straight up with the crane prominent. The view from across in front of Holt Renfrew on Bloor to the west, and from Balmuto across the street, views from Cumberland east of Bay, then from Bloor east of Yonge by the old Bay main entrance. And a final set from Bloor west at Bedford, 1 Bloor E now no longer visible behind 1 Bloor W. The view from Devonshire, south of Bloor, and from College and Queen's Park Crescent.
Nice!
 
September 11, 2024:

IMG_4096.jpeg
 
Ok , I'm back after a couple hours of digging.

First things first, the height increase was approved in June-2023 at 328.4m tall:


The project went into receivership in Oct-2023 the receiver applied for continued construction works from 29-Nov-2023 to 29-Nov-2024:


A similar question to my previous post was discussed at that time stating that the latest "New Building" permit still shows the height as 86 storeys.


This permit was issued on 19-Sep-2023 which is before the receivership date of 19-Oct-2023 which means the building was still under Mizrahi at the 328m height but yet listed as 86 storeys. This leads me to believe that it's only an oversight when authoring that short blurb.

I might also be completely wrong and just hoping for the height to remain at 328m and am holding on to whatever hope I can find!

Nice work bro. I don't know about any of this kind of stuff, but your posts makes at of sense that at least this is a possibility.
 
Ok , I'm back after a couple hours of digging.

First things first, the height increase was approved in June-2023 at 328.4m tall:


The project went into receivership in Oct-2023 the receiver applied for continued construction works from 29-Nov-2023 to 29-Nov-2024:


A similar question to my previous post was discussed at that time stating that the latest "New Building" permit still shows the height as 86 storeys.


This permit was issued on 19-Sep-2023 which is before the receivership date of 19-Oct-2023 which means the building was still under Mizrahi at the 328m height but yet listed as 86 storeys. This leads me to believe that it's only an oversight when authoring that short blurb.

I might also be completely wrong and just hoping for the height to remain at 328m and am holding on to whatever hope I can find!

Have a look at these for info.

Reports of the Receiver.

https://www.alvarezandmarsal.com/theone-receivers-reports
 
Have a look at these for info.

Reports of the Receiver.

https://www.alvarezandmarsal.com/theone-receivers-reports

So here's what I've found in the first review of the files from Alvarez and Marsal. The first report from A&M was authored in Feb-2024 outlining the status and next steps for The One. Interestingly, the report lists The One with the following information:

1. Introduction and all following sections state the project as 85 storeys.
2. Appendix E for Developer Agreements:
1000100621.png

84 storey mixed-use building with 720,000 gross square feet and 416 condo units.

But all of these point to the 85-storey version of the building to be in consideration. Sorry to be the bearer of bad news. It looks like Mizrahi got the approval for the taller building too late to incorporate it into the actual project.

I will continue to dig and see if there is any hope left for the taller building to see the light of day.
 
"Proposal to construct an 86 storey mixed use apartment building with 4 levels of below grade commercial parking and one level of below grade commercial space."

...so that includes retail, hotel and residential from ground up, I presume.

So any guess what the height will be here when all this is said and done?
 