Yes, the previous mechanical levels (17&18) were about four weeks each, slab and walls. This one has been tracking similar.
Wait, wait, wait...it was said they're slowing down because they're running out of floors or something. 😼
 
Another milestone: Finally reaches thaivic-san's horizon line of sight from the highest perch of 2 Bloor West...or something like that as well.

...next up: It will be Mr. BloorMan's turn! <3
 
Photos taken today, Friday (Sept. 15). Not much changed since my last post a week ago. None of the scaffolding has gone up, as the more-tedious work on the mechanical levels 37/38 continue. The one bit of progress to report is the installation of glass and cladding on the 9th floor behind the east and north Rail Climbing Systems (RCSs). Last week, glass was only installed on the south side, east of the crane. Now, the glass is almost completely installed on the east and north side; the cladding now seemingly fully installed on the east side, not yet on the north side.

My post starts with my usual "time-lapse" photo from the NE corner of Yonge and Bloor, followed by a wide shot from Cumberland east of Bay. No discernible differences in either from last week. Then, shots of the NE and NW corners under the RSCs, where we can see the progress of the glass and cladding installation on the 9th floor. Finally, a couple shots of the crane - hoisting something and its shadow against 1 Bloor E.