What a difference a day makes! Here are photos I took yesterday:

View attachment 495451View attachment 495452View attachment 495453View attachment 495454

Here are some photos taken just now. I have a gut feeling we'll see another floor pour tomorrow.

View attachment 495457View attachment 495458

Great updates as usual. It seems they still have to layout out 50% of the floor rebar and conduits plus the blue bases for the cladding. I wouldn’t be totally surprised if they pour it tomorrow but I would wager on Monday. The forecast also calls for rain tomorrow afternoon so they may schedule it for Monday anyways.
 
It feels like they are moving along super fast with regard to finishing-type touches on the base.

Does anyone have an idea if this is because they intend to open the base before the tower is finished topping out?
Is that even possible?
The intent is to open at least the retail while the tower is still under construction. Not sure about anything else on the lower levels, but technically anything that's accessed by the secondary elevator core could be opened as it's not dependent on the tower above being completed.

Aura also opened its retail before the tower was finished, so this won't even be the first time something like this has happened in Toronto.
 
Great updates as usual. It seems they still have to layout out 50% of the floor rebar and conduits plus the blue bases for the cladding. I wouldn’t be totally surprised if they pour it tomorrow but I would wager on Monday. The forecast also calls for rain tomorrow afternoon so they may schedule it for Monday anyways.
Thanks. So far, it's seems they pour the day after the electrical conduits start getting placed, so, you never know. I noticed a section of crane sitting on Yonge St just now.
 
The intent is to open at least the retail while the tower is still under construction. Not sure about anything else on the lower levels, but technically anything that's accessed by the secondary elevator core could be opened as it's not dependent on the tower above being completed.

Aura also opened it's retail before the tower was finished, so this won't even be the first time something like this has happened in Toronto.
Indeed. As long as precautions are taken to protect everyone from the construction above, it’s much better than having empty storefronts 7-8 years after construction is done (looking at the neighbour across the street).
 
Part 2 taken on July 26, 2023:

Yonge and Bloor (aka the Golden Corner or the Champagne Corner):

IMG_9361.jpeg
IMG_9362.jpeg
IMG_9363.jpeg
IMG_9364.jpeg
IMG_9365.jpeg
IMG_9366.jpeg
IMG_9367.jpeg
IMG_9368.jpeg
IMG_9369.jpeg
IMG_9370.jpeg
IMG_9371.jpeg
IMG_9372.jpeg


Edit: corrected date
 
Last edited:
seems the super columns had their first girth reduction? what floor did that happen on, when is next one?
 
PART 1: Photos taken today, Friday (July 28). My usual single post split into two, the first here is showing the windows going up behind the RCS scaffolding and some other shots.

As usual, I start with the wide beauty shot, with the blue scaffolding on the top and the corners having gone up one level since the last "time lapse" photo from a week ago.

Next, it seems the seventh floor windows now have mostly been installed, from the SE corner, along the east face, and most of the north face. The working platforms in the RCS units are flush to the windows and can swing up, presumably so the cladding sections can be placed. Maybe the windows for the seventh floor on the west side will be installed as before as the RCS is a floor higher. So photos going from the SE corner to the NE corner, the north side and a glimpse of the NW corner which has yet to have the windows placed.

A wide shot from Bay/Cumberland, and a shot of the crane with the temporary elevator now raised three more floors, to the 30th floor.

My "time-lapse" album on Flickr link Oct 2020-Jul 2023:


UTIMG_7399.jpg
UTIMG_7210.jpg
UTIMG_7103.jpg
UTIMG_7176.jpg
UTIMG_7359.jpg
UTIMG_7343.jpg
UTIMG_7319.jpg
UTIMG_7279.jpg
 
Last edited:

Back
Top