drum118
Superstar
Then there is the need to have a Broadview extension to service East Harbour that is to connect to the Commissioner line. You could build the Commissioner line as far as the new Broadview line with a setup for the line to go east at a future date.Yes, I think your dates are probably about right, there are at least some discussions on bringing a streetcar line along Commissioners to Leslie but there is total silence about anything going south of Commissioners - in addition to the south Cherry Bridge, any streetcar would also need to cross the Ship Channel. I strongly doubt it will ever happen.
It all boils down to funding and having transit first. When most of these lines are built, a lot of the board will be gone and never get the chance to ride any of it.
As for the line for South Cherry St, never like it been loop there as plan and prefer to see it go over the shipping channel to service Cherry Beach considering there was to have been an LRT line on Unwin to Leslie and up Leslie. The line was approved under the master plan and got removed by the city somewhere around 10 years ago as they say it beyond the 50-year time frame to have it built. With the removal of Unwin line, the Cherry St loop would be on the northside of the shipping channel.
What was being proposed for the shipping turning area that will support the Commissioner line has gone MIA.