AnnetteMeetsJane
Active Member
The GC for 182/184 Spadina has leased the 170 Spadina site from Plaza and relocated equipment and snow from the construction site to there today. They also started some excavation on the 182/184 site today, although I am not sure whether drilling/casson placement has been completed. The shoring rig was moved to the 170 site.
Cameron St is the staging area for Metrolynx as well as the 182-184 site so there are always dump trucks parked along there these days. It’s a zoo.
Cameron St is the staging area for Metrolynx as well as the 182-184 site so there are always dump trucks parked along there these days. It’s a zoo.