July 28
Took a quick look at the north today before I leave on Sat. Next time will be in Sept
Southbound lanes south of Eglinton been pave for the new lanes. Once done, work on the guideway can get under way
Next intersection to be close will be Watergarden Dr as the rails are there for it.
Bristol still a long way from been open as plan
Various curbs have been pour for some of the guideway and it may see some trackwork by year end.
The rails for Matheson platform still not completed nor have concrete to anchor then in place,
Britannia e-w down to a single lane each way with no turning in any direction. Intersection will not reopen until the end of Aug
The 401 westbound ramp is now open for Hurontario.
Still a lot of trackwork to be done between Courtneypark and Derry to be 100% complete.
Derry platform built
Topflight close and a guessing game when it will reopen with all the T trackwork in place. Nice Opps!! for the barriers to protect the guideway that they are in the wrong location and be remove and bult in the correct location
The outbound track from OMS is being built and almost up to where the inbound starts.
Looks like some OPPS at the OMS and can see where concrete and rail has bee removed.
Digging and placing supports for the sound barrier along the 407 side underway
Get a lot of info from the police on site as to various issues taking place as well delaying the work. This goes in hand talking to various workers. A lot of area where stormwater and water lines are to go in are hitting a lot of utilities that has to be removed by x or relocated not shown on the plans it can take a week or 2 before work can resume and delaying the project
Some are saying 2025 before the line is built and testing can get underway for the whole line. I am now saying Q3 in 2025 before service starts. Lack of worker are delaying this line as well.
More photos up on my site. Looks like I have a major issue with the lens that can't be looked at until I return from my trip on top what I already know. Couldn't get the lens in and back before my trip as it needs 4 week turn around.