Concrete floor pouring for the office last week, bus garage doors 17 of 22 garage doors has been installed and pouring on the top of the parking garage. These pics are from May 14 and 20)
Earlier this morning there was a Hamilton Wastewater workers picketing at the New HSR facility site and City’s operations centre on Wentworth.
These HOWEA workers are on strike and usually picketing outside the Woodward Wastewater treatment plant since May 14 and sometimes on other city properties.
Installations around office building, bollards installed around garage doors, curb installations underway and CNG tanks installed at the back. Landscaping will be beginning in the fall along with the sidewalks around Brant and Hillyard streets. (Aug 22, 2025)