DonValleyRainbow
Senior Member
looking at the design plates, the grade seperation at the CP crossing will be interesting. Looks like a pretty unique piece of infrastructure being placed mid road like that while the regular lanes remain at grade.

I wonder what the extra cost saved here is. I know it's a little used spur but how much extra variable cost is there in including the road lanes?