News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.8K     0 
At least the Eglinton Crosstown LRT tracker makes much more frequent updates than the Spadina extension tracker; the former updates itself one to two weeks, while the latter updates itself every few months.

When do you start your job as TBM updater? :)

I wish. I will receive my GIS certificate on June.

UT should hire you as our TBM updater tracker. Keep us informed of the the TBM updater is updated ;)
 
UT should hire you as our TBM updater tracker. Keep us informed of the the TBM updater is updated ;)

Been noticing surveyors on Eglinton W. at Gabian Way at night for the past couple of weeks. Would have thought they moved further east by now, if they are tracking & following the TBM under them.
 
The tracker map must have been updated today by a manager and not the student. It shows the tracker made a right turn south on Keele Street, but the pins are still on Eglinton. Hopefully, the student will have a free period to correct it.

The map must be indicating that the tunnel caved in all the way back to Keele. Months of work lost!
 
Anyone know when the surface contract will be handed out? Hudak will probably cancel it if he wins office and it hasn't been awarded yet.
 
http://www.thecrosstown.ca/get-involved/upcoming-events
Two events next week. They seem mostly to be for Q&A, no presentation, so I probably won't go.

However you can bring up your urgent issues directly with them, like:
-trying to make elevated east side happen
-south side alignment at Leslie
-DRL connection at Don Mills
-stop spacing
-increasing TBM tracker updating frequency to higher than once a week
-whether Johnny Au can be hired as TBM updater
-why the tunnel has caved back in
 
http://www.thecrosstown.ca/get-involved/upcoming-events
Two events next week. They seem mostly to be for Q&A, no presentation, so I probably won't go.

However you can bring up your urgent issues directly with them, like:
-trying to make elevated east side happen
-south side alignment at Leslie
-DRL connection at Don Mills
-stop spacing
-increasing TBM tracker updating frequency to higher than once a week
-whether Johnny Au can be hired as TBM updater
-why the tunnel has caved back in
I can't attend, but I have my resumé ready if they ask me to update the TBM tracker.
 
http://www.thecrosstown.ca/get-involved/upcoming-events
Two events next week. They seem mostly to be for Q&A, no presentation, so I probably won't go.

However you can bring up your urgent issues directly with them, like:
-trying to make elevated east side happen
-south side alignment at Leslie
-DRL connection at Don Mills
-stop spacing
-increasing TBM tracker updating frequency to higher than once a week
-whether Johnny Au can be hired as TBM updater
-why the tunnel has caved back in

I wrote Metrolinx back in August asking about the first two points. I will continue to wait for a response rather than attending. I suspect a reply should be coming any day now.
 
only the last 3 are really changable at this point, the EA Process is finished and changing anything else would require an EA amendment which is too late for.
 

Back
Top