It feels like DIALOG hired the P+S/IBI Group multi-res design team in the mid-2000s, froze them in cryo-sleep chambers, and then un-froze them in the 2020's and unleashed their work on the city.
 
09/14/2024:
Canopy_1.png
Canopy_2.png
 
Past the site over a week ago and shoring rig is on site for the final phase for the site. A tower cane could be up in Q2 of 2025
 
Dec 4
Excavation is well under way for the final tower and podium

Unedited and not on line
133A2370a.JPG
133A2385.JPG
133A2384.JPG
 
December 27th photos - posts might get a little messy here since I flew a lot between boxing day and New Year's eve and flew over this site a couple of times on different days.
1735744867237.jpeg

1735744920993.jpeg

1735744950381.jpeg

1735745008366.jpeg
 
Feb 1
More up on my site

They are making difficult to get good shots of the hole at ground level since my last visited as they have installed a second set of fencing further back from the one around the hole.

They have about 15 more feed to excavate to get to bottom parking level of the first phase.
54301399958_649628df2d_b.jpg

54301143586_80ac9e95e4_b.jpg

54300272437_3fdb40bea8_b.jpg

54301399788_a9fa2126a2_b.jpg

54300272842_7038fd34c2_b.jpg

54301389759_cce4c0950d_b.jpg
 
April 3
More up on my site

By the end of the month, they could start work on the parking columns as they are at the base of phase 1 with a lot more material to be remove.
54430448832_3e00bd3f18_b.jpg

54431550878_a4a9545bde_b.jpg

54431678020_fe0c2f4dcc_b.jpg

54430448827_b81edfd597_b.jpg

54431550938_1c378a9623_b.jpg
 
April 25
May should see construction start on the parking area as most of the area is now down to the bottom for it with the sidewall being smooth for the shale rock and the jackhammering to reduce the width of the ramp
54476414928_c7a5c5101b_o.jpg

54476134031_a2e9bc4180_o.jpg

54476414583_1a5141658d_o.jpg

54476414908_b129439b11_o.jpg

54476414953_f2322c3dd7_o.jpg
 
I saw a crane in the area from the bus on the 403. Seeing as there doesn't seem to be any other projects in the area that are at this stage of construction, I assume its for this development.
 
I saw a crane in the area from the bus on the 403. Seeing as there doesn't seem to be any other projects in the area that are at this stage of construction, I assume its for this development.
This area is dead now until the market changes unless rental. There is 50 towers plan for this area over the next 20 year, if not more. The plaza next to this site will see towers down the road and the one on the south side of Eglinton will be gone in 20 or so years with most of the towers going there,

There are 2 cranes up now and the site been dead for months until they went up.
 