4th floor is underway on the Cawthra side (August 31, 2025)
img_0672-jpeg.678889
IMG_0701.jpeg
 

Attachments

  • IMG_0672.jpeg
    IMG_0672.jpeg
    163.8 KB · Views: 81

Back
Top