New rendering updated in the database and taken from the architectural plan via SPA.

PLN - Architectural Plans - FEB 28  2023 (1)-1.jpg


PLN - Architectural Plans - FEB 28  2023 (1)-11.jpg


PLN - Architectural Plans - FEB 28  2023 (1)-13.jpg
 
No pics but the substation on the north side of the site is currently under construction, also looks like hydro one is running a power line from rexdale all the way over east and then south across the 401 to get power to the facility, Rexdale and Islington and some side streets are currently under construction for trenching of the power lines.


Islingtonmap.png
 
No pics but the substation on the north side of the site is currently under construction, also looks like hydro one is running a power line from rexdale all the way over east and then south across the 401 to get power to the facility, Rexdale and Islington and some side streets are currently under construction for trenching of the power lines.


View attachment 614226
That map shows the new streets that have been constructed south of of Rexdale Blvd., but still has the old configuration of the Rexdale/Islington intersection.

Anyways, thanks for sharing this, it's good to know why my neighbourhood has been torn apart for the past month.
 
From the tail end of July, exterior cladding is almost completed. In the last photo they're using an external scaffold to lift heavier supplies into the upper level(s) inside.
20250711_161105.jpg
20250711_161102.jpg
20250711_161115.jpg
20250723_164414.jpg
 