The arches / brackets "supporting" the overhang look great.
That @Art Tsai always trying to hide a bit of the info...............
LOL
From the Cover Letter, we learn this was appealed to the OLT on July 7th, 2023.
***
Doesn't look like we did the elevator ratio here. Only 4 of 'em to 456 units; 0.88 elevators per 100 units
***
Detailed drawings now show street trees.
***
The introduction of visible arches under the overhang is a new design feature in this iteration.
Podum massing has been rearranged.
The houses on McGill were vacant, occupied by squatters building open fires, presenting a fire risk to the neighbourhood. Neighbours and the local Residents' Association requested the developer expedite their demolition and the City agreed and issued the permits.Demo permits here were in hand from 2023 for the townhomes.
No demo permits exist for 396/398 Church.
There are no building permits applied for.
The SPA remains in process, NOAC is not issued.