vebski
New Member
Saw traffic on the new Tremaine overpass yesterday. Not sure when it opened, but vehicles are now flowing!
They should have the 401 reopen early Sunday morning based on what they did for the QEW Dixie Rd bridge last year. It will be a zoo from closure to reopening.They’ve completely removed the ramps (soil and all) leading up to the bridge now. All that remains are the abutments, centre pier and road deck.
Still have to rebuild a few bridges to support the 10 lanes and ramps first. This doesn't stop building west from R225/Tremaine in phases. It took close to 3 years to do 19km to R25 from the Credit RiverI'm assuming the Highway 6 Morriston Bypass will be getting built before widening the 401 through that section?
I've driven that many times - but I've never heard that term before. It doesn't Google either.For those who don't know, the stretch of Highway 8 between the freeway part and the 401 where you have to drive through a bunch of stoplights surrounded by big box barf is often called 'the funhouse'. This stretch- https://www.google.com/maps/dir/43.3996794,-80.3828017/43.4164431,-80.4090962/@43.4092451,-80.4047061,2598m/data=!3m1!1e3!4m2!4m1!3e0?entry=ttu&g_ep=EgoyMDI1MDgxMC4wIKXMDSoASAFQAw==
Have they come out with a design yet for this bridge that will go over the 401 and onto Hwy 8 ? Would like to see where exactly that will be dropping down before sportsworld drive.