afransen
Senior Member
Twin First Canadian Place?
From the TPA's last meeting (June 2025), The West side is supposed to be finished "in September 2025" so I assume it will open shortly and the work on the west side is about to start:The east end of The Esplanade parking garage renovation started last month.
It looks like they are redoing the joints between the precast sections of concrete and removing the painted white lines.
I’m not sure if they are replacing and concrete or just resurfacing/sealing the concrete decks.
The West end is not open yet but it looks like it should be open this year.
West End pictures
View attachment 685451
View attachment 685450
View attachment 685449
View attachment 685448
View attachment 685447
East end pictures
View attachment 685452
I’m not sure what this old repair was all about.
View attachment 685453
Just like painting a new car, The repaired sectioned peels.
View attachment 685454
Only a few spots like this.
View attachment 685455
View attachment 685456
I’m not sure if these types of cracks are off any concern or will just be sealed up.
View attachment 685457
View attachment 685458
It looks like they sealed cracks in the past.
View attachment 685459
5th level below the open deck.
View attachment 685460