So long as the ROW is not built on, outside of something like a rail trail, this is a safer option than just leaving the tracks there. It is when things are build on the ROW that would be very depressing.
They are putting a trunk watermain under the Right of way.
 
Even rail trails are often a death knell to ever using the tracks again, especially if the rail trail goes through backyards where there once was rail. You get monumental pushback if you try to make it rail again. A trail raises property values and a rail of course does not.

I understand that.Much easier to lower property values than it is to find a whole new ROW. Selling it as a way to improve transportation can help cushion that blow.

They are putting a trunk watermain under the Right of way.
I read that. I am wondering how that could effect putting rails back.
 
Taken July 15th, former OBRY customers in Orangeville.

DJI_20250712204853_0166_D.jpg


DJI_20250712204555_0154_D.jpg


DJI_20250712204410_0152_D.jpg


DJI_20250712204203_0143_D.jpg
 
Last edited:
No, not south of Broadway (old Highway 9). That’s still to come.

The industrial spurs are still largely intact even when Orangeville removed much of the main track through town.
I would suspect the industrial spurs are on private property so likely the responsibility of the owners (who may simply not care).
 
I would suspect the industrial spurs are on private property so likely the responsibility of the owners (who may simply not care).
If I recall properly, that industrial park at the north end of town was purpose-designed and built by the Town in the 1980s explicitly with and for railroad access. The track is owned by the town, who would have then leased it to the railway.

Dan
 
The Town of Caledon's website says it's in the detailed design and construction phase, but didn't see any construction notices?

The detailed design usually doesn't require any construction notices published until they reach 70% to 80% and the build is tendered and approved, then they can apply to the region / town for road closure notices to be published and permits to be issued once approved.
 
Here are some more pictures:
20250923_153942.jpg
20250923_154023.jpg
20250923_154142.jpg
20250923_154242~2.jpg
20250923_155448.jpg
20250923_161153.jpg
20250923_161211.jpg
20250923_161648.jpg
20250923_161701.jpg
20250923_164818.jpg
20250923_170206.jpg
20250923_170641.jpg


Here is a picture of the Derry road crossing on July 10th, 2025
20250710_205644.jpg


And here is a picture of it in roughly the same spot on September 23, 2025
20250923_172542.jpg
 