MacLac
Senior Member
East of Gateway BLVD and the tracks…..by the Eco Recycling Center? Between the tracks and PCL’s HQ? That lot?
East of Gateway BLVD and the tracks…..by the Eco Recycling Center? Between the tracks and PCL’s HQ? That lot?
| Status | Approved |
| Permit Date | Sep 29, 2025 |
| Neighbourhood | CORONET INDUSTRIAL |
| Address | 10110 - 51 AVENUE NW |
| Legal Description | Plan 0721428 Blk 13 Lot 31 |
| Description of Development | To construct exterior alterations for the purpose of site regrading for future Surface Parking lot and new building, reference development pre-application meeting #625355930-001. |
| Zoning | DC,BE |
51 Ave east of the CPR tracks on the north side has a bunch of earth movers and equipment flattening out the site. This has been empty for seems forever. Could not see a sign describing what is getting built though.
| Major Development Permit | ||||||||||||||||||||
|
Here's some more from the document. Their plan is to develop the site over a period of eight years (I'm guessing that just refers to utilities, surface infrastructure, and landscaping), and it'll have a maximum of 4,200 units. I want to be hopeful, but they say multiple times throughout the document that Times Square was already built in 2015-18 (at the same time as The Louvre and Century Tower), and it just worries me a little that they're off by a whole building.Century Park rezoning application going to EDC on November 18, 2025:
View attachment 694297
View attachment 694298
New development permit for the former CapitalCare Greenfield site (behind the NoFrills on 40 Ave).
View attachment 694869
View attachment 694868




