What is the work happening at the Warden and Danforth bridge? Its not on the Ontario line, so are they just adding another track on the north side for bypass purposes?
I was under the impression that the current plan for Confederation GO based on recent diagrams would have the train joining the existing mainline immediately after West Harbour rather than extending the tracks all the way to Confederation. But I guess that's no longer the plan?A month later, not much (visible) progress, though there was a small crew doing some work east of the Mary Street bridge.
Last update I’ve seen is a ‘late 2024 completion’, anyone know if that’s been updated?
I’m hoping it will be done for the fall schedule release.
(facing east toward Mary Street)
View attachment 552776
(facing west toward West Harbour GO Stn)
View attachment 552774
View attachment 552773
The current plan has the West Harbour tracks tying back into the CN mainline around the Mary Street pedestrian bridge IIRC.I was under the impression that the current plan for Confederation GO based on recent diagrams would have the train joining the existing mainline immediately after West Harbour rather than extending the tracks all the way to Confederation. But I guess that's no longer the plan?
Yes. There will be 4 mainline tracks from the Don River to Scarborough Station, where the Stouffville Line branches off.What is the work happening at the Warden and Danforth bridge? Its not on the Ontario line, so are they just adding another track on the north side for bypass purposes?
There will be four tracks until the Stouffville line splits off, so the work must be for adding another track.What is the work happening at the Warden and Danforth bridge? Its not on the Ontario line, so are they just adding another track on the north side for bypass purposes?
It may look track ready, but far from it as of March 28, New track mast, signal boxes and installing the cables for them was underway when I shot it. Until that is completed and working, tracks and switches cannot be install, It look like there still other work to be done as well.Well the good news is that it looks track-ready. What might slow it down is 1) the date CN has in mind for cutting it into their mainline and 2) the signalling commissioning date. I would assume that both those events are already scheduled and even if track laying happens tomorrow, those dates would not change. That’s just how the Class 1s operate!
Exactly. Warden also had a span added a few years ago, for the 3rd track that was needed to support Lakeshore all-day both-ways every 15 minutes.There will be four tracks until the Stouffville line splits off, so the work must be for adding another track.
Someone should remind them they had rebuilt Guildwood Station with room for a fourth track a few years ago, and then seemed to just forget.Exactly. Warden also had a span added a few years ago, for the 3rd track that was needed to support Lakeshore all-day both-ways every 15 minutes.
Woodbine has already been done, and done quite quickly - looks as though it was always designed for 4 tracks, and they simply had to knock out some bits to do it.
Victoria Park, and Coxwell eastwards were already built for 4 tracks (or more). Though many east of Pape are now being expanded to handle 6 tracks (two for Ontario).
Will GO and VIA be able to push enough service through there to bother, without a grade sep at Scarborough Junction?Someone should remind them they had rebuilt Guildwood Station with room for a fourth track a few years ago, and then seemed to just forget.
we heard a few years ago that the scarborough junction isnt needed because of how they are going to aligh the tracks with service patterns. instead of having the express trains for both lines be on the inside 2 tracks and all stops being on the outside 2 tracks.Will GO and VIA be able to push enough service through there to bother, without a grade sep at Scarborough Junction?
There is zero need to have the services segregated like that. And in fact, it would be detrimental to the overall capacity of the system to operate the trains like that.Theyre configuring the service to be stouville only trains on the first 2 tracks and all lse trains on the south 2 tracks
Will GO and VIA be able to push enough service through there to bother, without a grade sep at Scarborough Junction?
Their design for the grade separation at Scarborough Junction only had three tracks continuing east on Lakeshore, with no apparent room for more, and there have been GO expansion plans in the past with four or more tracks, hence that it seems they forgot about work and plans they have already done.Will GO and VIA be able to push enough service through there to bother, without a grade sep at Scarborough Junction?
Grade separation where? Midland (+ Brimley and McCowan) already has 4 tracks (though one looks like it hasn't seen service forever), and seems to be built for 5.Their design for the grade separation at Scarborough Junction only had three tracks continuing east on Lakeshore, with no apparent room for more, and there have been GO expansion plans in the past with four or more tracks, hence that it seems they forgot about work and plans they have already done.