I don't know of any utility conflicts, but this project is taking its sweet time getting built. We are almost into the 4th year for it and another Burlington, with ML being the problem. One can guess ML is looking at building the 5th track to Mimico and that can't happen until the Dufferin bridge is rebuilt and as noted by smallspy. Then there is the realignment for the 8 tracks for the Weston sub that still has to be finish.
The tunnel is a major issue that requires a 2nd one.
With the expansion of the streetcar line from the loop to Dufferin St to be in operation by 2020, the current entrance will have to be rebuilt and a good time to look at the 2nd tunnel. This will require building a tunnel under TTC tracks and where it will exited is going to be a major problem.
Even with a 2nd tunnel, the new north stair will be a bitch and will require a 2nd stairwell.
I don't know of any utility conflicts, but this project is taking its sweet time getting built. We are almost into the 4th year for it and another Burlington, with ML being the problem. One can guess ML is looking at building the 5th track to Mimico and that can't happen until the Dufferin bridge is rebuilt and as noted by smallspy.
Fully agree and head shaking to go there an see no tracks that were supposed to be at least 2 years ago today.They can certainly put in the fifth track as far as Dufferin. The interlocking to tie the fifth track into the existing Track 1 has been in place and has been operational for several years now. That would at least let some trains (especially equipment moves) clear Fort York more promptly. If they don't intend to do that, it was a bit of a waste to install that signal bridge and the added signalling.
- Paul
Even with a 2nd tunnel, the new north stair will be a bitch and will require a 2nd stairwell.
That shouldn't be a problem. That's been in the planning stages for decades, and those plans show that the tunnel extension and new exit take it into account.EDIT: ooooohhhh.......I think I just connected the dots on another hold-up/complication.
I suppose that "technically" construction is complete, as there is probably a contract that has been finished. But the reality on the ground is that construction is NOT complete, and they have not achieved much at all over the last few years (has it been 3 or 4 now?) as the new exit is still not open.That shouldn't be a problem. That's been in the planning stages for decades, and those plans show that the tunnel extension and new exit take it into account.
The project website is at http://www.gotransit.com/public/en/improve/projects/exhibition_station.aspx - link seems to be broken though - can't find any version under a year old. https://web.archive.org/web/2016032...c/en/improve/projects/exhibition_station.aspx
A couple of recent Twitter threads:
View attachment 107548
No answer ever came. Seems that changes from the electrification are an issue. Not sure why they can't just open the exit building, to alleviate the post-game crush in the tunnel.
View attachment 107547
Construction has been completed? Not sure how that can be the case with the construction hoarding everywhere, and the half-built new tunnel entrance. Sounds all very odd.
Well if they are going to be that "cute" with their PR department then they might as well shut it down cause anything they tell us is meaningless......for a station to have it's construction "complete" there should be, at a minimum, 3 criteriaI suppose that "technically" construction is complete, as there is probably a contract that has been finished. But the reality on the ground is that construction is NOT complete, and they have not achieved much at all over the last few years (has it been 3 or 4 now?) as the new exit is still not open.
Metrolinx and TTC, at a Shoppers Drug Mart? But no city? So clearly not SmartTrack.Minister Del Duca press conference Monday. It includes TTC Chair Josh Cole, Metrolinx CEO, and the MPP for Trinity Spadina.
I could potentially see this in few different threads (SmartTrack, electrification) but picked this one.
Metrolinx and TTC, at a Shoppers Drug Mart? But no city? So clearly not SmartTrack.
Seems pretty obvious to me that it's announcement at something being sold at Shoppers Drugmart. TTC has long talked of expanding Presto sales to retailers. Presumably this is an announcement about Presto sales through Shoppers Drugmart.
Which means it should be in the Presto thread.
Metrolinx and TTC, at a Shoppers Drug Mart? But no city? So clearly not SmartTrack.
Seems pretty obvious to me that it's announcement at something being sold at Shoppers Drugmart. TTC has long talked of expanding Presto sales to retailers. Presumably this is an announcement about Presto sales through Shoppers Drugmart.
Which means it should be in the Presto thread.