What do you think of this project?


  • Total voters
    74
Ledcor
Our Ledcor team recently finished a long and challenging pour of the concrete slab that will be supporting this 9-level tower. It took 17 hours and 99 cement trucks to complete.

Station Lands North is a mid-rise rental residential tower atop a 4-level mixed-use podium that will form part of The Switch at Station Lands – a dynamic live-work environment in Edmonton, Alberta.

Check out the video to see how it was done!
[/COLOR]
 
Ledcor
Our Ledcor team recently finished a long and challenging pour of the concrete slab that will be supporting this 9-level tower. It took 17 hours and 99 cement trucks to complete.

Station Lands North is a mid-rise rental residential tower atop a 4-level mixed-use podium that will form part of The Switch at Station Lands – a dynamic live-work environment in Edmonton, Alberta.

Check out the video to see how it was done!
[/COLOR]
An old video from them doing the slab pour last year? I can’t find it on YouTube nor on Ledcor’s site
 
^ ^^ ^^^ ^^^^
my guess is someone let them know that there was an error in the post and in the underlying video - rather than sharing it in a “gotcha” post - so they could correct it.

the video was of the recent “fifth floor transfer slab” pour, not an earlier foundation slab pour.

knowing ledcor i would guess it will be back up once corrected.
 
Nice…..thanks! So of the 5th floor transfer slab of the “25/39 storey tower,” NOT of the 16 midrise (Switch building).
 
Looks as though the ground has been prepared for foundations
IMG_2607.jpeg
 

Mentions how they are going to incorporate cherry blossom trees and red lanterns into the “common areas” I presume…..
 

Back
Top