News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

Dundas Street Bridge Stairs down to the trail...

20251101_130135.jpg


20251101_130047.jpg


20251101_130057.jpg


20251101_125947.jpg


20251101_130033.jpg


20251101_130110.jpg
 
As noted above, last week I (and maybe others) told 311 that the Martin Goodman on Cherry between the Ship Channel Bridge and Unwin needed some TLC. I hope they will do LOTS more but someone has now leveled out the worst of the depressions and bumps with fresh asphalt!

I can also report that the contractors who are fixing and resurfacing the Martin Goodman between Cherry Beach and the Unwin Bridge now have a paving machine parked on Regatta Road - presumably ready to start the paving next week.
 
Part of the much maligned bike lane design on Bloor in Etobicoke has started construction on restoring the second EB multi-purpose lane for a 500m stretch. But I wonder how the 2nd lane will still drop approaching Islington without resulting in an awkward merge.

 

Back
Top