Undead
Senior Member
Materials released for the Bathurst bike lanes and street rebuild:
I don't think eliminating one of the sidewalks is the solution. They should put a cycle track there, not just a multi-use path - because the cyclists aren't going to follow the necessary rules.Materials released for the Bathurst bike lanes and street rebuild:
View attachment 626685View attachment 626686View attachment 626687
I've seen idiots in all age groups!
The Ontario gov't as one of its final pre-election acts has hired an engineering firm to do the design work on cycle track removal on Bloor, University and Yonge.
Irritating though this is, and a gross misuse of public funds.......it also means the Cycle Tracks will be safe well into spring, and perhaps beyond as the design work will take awhile, then tendering of construction would follow that.
Is this for sections or the entirety?
@Northern Light that is actually very shocking news. Won’t be much left of a cycling network by ripping out those key sections. Sad!
@Northern Light - why shouldn’t it come to pass anymore?
Olivia Chow seems not to care and quiet on that file. I see no real opposition!
For one, the pressure to do something won't be as much if the Tories don't get re-elected.@Northern Light - why shouldn’t it come to pass anymore? Olivia Chow seems not to care and quiet on that file. I see no real opposition!
I for one am prepared to donate my Ford bribery cheque to whoever is the strongest opposition candidate in Prabmeet Sarkaria's riding.For one, the pressure to do something won't be as much if the Tories don't get re-elected.
Secondly, the latest polling only gatv Ford a (strong) minority. And historically when you call an election after only 3 years, the electorate further penalizes you. Let alone after closer to 2.5 years.
I have no idea why they are calling an election that may well not give them a majority, rather than waiting until June 2026.