Mihairokov
Active Member
China's solution is elevated everything, in this case three separate HSR/standard rail lines:Instead, the line should be built on viaducts so to avoid the bogs and streams as much as possible (albeit at a higher initial cost, but lower maintenance costs):
Otherwise pretty flat:
