News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.8K     0 

J.OT13

Senior Member
Staff member
Member Bio
Joined
Dec 21, 2023
Messages
2,149
Reaction score
1,395
DevApps: https://devapps.ottawa.ca/en/applications/D07-12-26-0037/details

Location: https://www.google.com/maps/place/319+Huntmar+Dr,+Stittsville,+ON+K2S+0P6/@45.2974789,-75.9358404,583m/data=!3m2!1e3!4b1!4m6!3m5!1s0x4cd2008a38db07f3:0x4065a3f403e3fa0a!8m2!3d45.2974789!4d-75.9332655!16s/g/11kr_f2xbh?entry=ttu&g_ep=EgoyMDI2MDUxMC4wIKXMDSoASAFQAw==

1778687428894.png


Description
: The Applicant is proposing to construct six (6) multi-unit residential buildings of six (6) storeys in height onthe Subject Property, as shown in Figure 6 below. The proposed development will create 472 new residentialunits to achieve a density of 146 units per gross hectare and a floor space index of 1.27. The proposeddevelopment will provide 551 parking spaces, 195 of which are provided within underground parkadesassociated with each building, and 62 bicycle parking spaces.

Site Plan:
1778687156170.png


Renderings:
1778687162923.png

1778687210312.png

1778687227688.png

1778687242644.png
 
Being right next to the outlets does it need that much parking.
It does not. I was really hoping the residential aspect would be better woven into the fake village fabric, like a ski village.
 
When is the LRT going to reach that area of Kanata again? 2035? 2040 at this point?
No timeline. Sutcliffe has been lukewarm on the expansion and Ford said he wouldn't fund Stage 3 until the O-Train is "fixed", and this was during the stretch where the train worked pretty well.
 
No timeline. Sutcliffe has been lukewarm on the expansion and Ford said he wouldn't fund Stage 3 until the O-Train is "fixed", and this was during the stretch where the train worked pretty well.
Ford backtracked on that after the issue in Toronto.
 
Ford backtracked on that after the issue in Toronto.
Did he? Because Metrolinx has a rich history of being bad at managing urban rail projects, and that didn't seem to dissuade him when he made that announcement.
 
Did he? Because Metrolinx has a rich history of being bad at managing urban rail projects, and that didn't seem to dissuade him when he made that announcement.
After he did say Ontario would launch a inquiry in Ottawa lrt the NDP told him to do the same with crosstown.He back tracked his comments regarding Ottawa in terms of future funding.
 
Would have been cool to include like, some retail. Just a ground level coffee shop or convenience store or perhaps some Ottawa classics such as a nail bar, vape/weed stores and a pharmacy lol
 
Would have been cool to include like, some retail. Just a ground level coffee shop or convenience store or perhaps some Ottawa classics such as a nail bar, vape/weed stores and a pharmacy lol
Fully agree. Had they built this as an extension of the mall, they could have included retail suited to the residential component like a pharmacy, corner store, or Shopper's that acts as both.
 

Back
Top