Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
W
Westey
reacted to
Jonathan's Junction's post
in the thread
Roads: Ontario/GTA Highways Discussion
with
Like
.
*Ontario Tall Wall lol
Jun 7, 2026
W
Westey
replied to the thread
Highway 425 – Bradford Bypass (MTO)
.
I wondered. Assume the current replacement on new alignment costs $90M, and will take 2 full years of construction. What if the...
Jun 7, 2026
W
Westey
reacted to
ShonTron's post
in the thread
Premier Doug Ford's Ontario
with
Like
.
A reminder here after reading the last two pages: please don’t post entire news articles. Post a link, a one or two paragraph...
Jun 4, 2026
W
Westey
replied to the thread
Roads: Ontario/GTA Highways Discussion
.
At first I hoped it was for this Grand River Bridge (Caledonia). But alas, I think it's this one (Highway 7 New).
Jun 4, 2026
W
Westey
replied to the thread
Toronto
Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
.
By "this" - I assume you are referring to the post above the one you replied to. I think both REM and Vancouver SkyTrain have been...
Jun 2, 2026
W
Westey
replied to the thread
Toronto
Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx
.
It's the lack of maintenance that was the big problem. Vancouver was on Generation 3 vehicles while we were still running 1st gen.
May 31, 2026
W
Westey
replied to the thread
Sheppard Line 4 Subway Extension (Proposed)
.
or handed back to cars in the winter when bicycle traffic virtually disappears. Although I suppose a 1.5m bicycle lane makes a good...
May 30, 2026
W
Westey
replied to the thread
The coming $26 billion windfall for the Canadian Armed Forces. What to buy?
.
Is this another way of saying the economy is so poor to the youth (under 25) that no other job can be found.
May 20, 2026
W
Westey
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
The 2 things I remember on this. 1) That Sunnybrook stop, underground, would have cost $60M. in hind-sight, and even foresight at the...
May 18, 2026
W
Westey
replied to the thread
Roads: Ontario/GTA Highways Discussion
.
I quickly measure this as 145km from the 1000 Island bridge to Ottawa - so it saves 20km. (maybe 30km it saves on the Kingston to...
May 18, 2026
W
Westey
replied to the thread
Roads: Ontario/GTA Highways Discussion
.
As the crow flies, Ottawa is 121 km from 1000 Island Bridge. As the car drives, it's 165 km. That's not that bad - 75% efficiency...
May 18, 2026
W
Westey
reacted to
nfitz's post
in the thread
Highway 425 – Bradford Bypass (MTO)
with
Like
.
Why? 401/16 is already pretty direct. The 15 corridor is to the west. There's little north of here, and some rought terrain. What's the...
May 18, 2026
W
Westey
replied to the thread
Highway 425 – Bradford Bypass (MTO)
.
I guess the alternative is to build a whole new freeway as was done from Huntsville to North Bay. That killed things even more
May 17, 2026
W
Westey
replied to the thread
Highway 425 – Bradford Bypass (MTO)
.
Does Brantford Really need a perpendicular highway, or can this veer towards Hamilton instead. I thought the experience from Hanlon...
May 17, 2026
W
Westey
replied to the thread
Toronto
Toronto | Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx
.
But the better plan was to connect STR (edit - SRT) to the elevated Eglinton Line, which could take you to Ontario Line. That way the...
May 17, 2026
Members
Back
Top