  1. urbottawa

    Ādisōke - Ottawa Public Library and Library and Archives Canada Joint Facility | ?m | 5s | City of Ottawa | Diamond Schmitt | U/C

    They were testing the soffit lighting last night - looks so good!
  2. urbottawa

    137-141 George St | 70m | 22s | Claridge | NEUF

    Curved section glass is starting to be installed. Looks like it’s going to be a darker palette than the original renders.
  3. urbottawa

    Odenak | 665 Albert St. | 105+123.7m | 31+36s | Dream+Multifaith | Perkins&Will+KPMB+Two Row | U/C

    From the Coventry bridge. These are also juuust visible at the top of flora foot bridge
  4. urbottawa

    Artefact on Argyle | 38m | 12s | Colonnade BridgePort | RLA

    Scaffolding up for the heritage facade
  5. urbottawa

    NCC - General Updates

    Looks like the west memorial building is getting closer to being done. New lighting in line with the NCC capital illumination plan is looking good
  6. urbottawa

    Office to Residential Conversions

    Can’t remember if either of these have their own threads
  7. urbottawa

    315 Miwate at Zibi [Block 204] | 74.57m | 23s | Dream | NEUF

    The plaza is really starting to feel complete and urban, now it just needs shops and people!
  8. urbottawa

    Artefact on Argyle | 38m | 12s | Colonnade BridgePort | RLA

    Crane is down and brick has started. Was hoping the buff brick was going to a be a little less uniform and more varied, but still looks decent
  9. urbottawa

    Odenak | 665 Albert St. | 105+123.7m | 31+36s | Dream+Multifaith | Perkins&Will+KPMB+Two Row | U/C

    I’ll throw another angle into the mix, from the museum of nature: