Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
U
urbanclient
reacted to
dowlingm's post
in the thread
Billy Bishop Airport Expansion?
with
Sad
.
https://www.torontotoday.ca/local/city-hall/billy-bishop-records-shielded-public-12358760
Jun 1, 2026
U
urbanclient
reacted to
innsertnamehere's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
I feel like these are AI generated - they definitely have the signatures of that.
Jun 1, 2026
U
urbanclient
replied to the thread
TTC: Other Items (catch all)
.
I think the assumption is that comparing interactions to total population is not the best comparison, but rather interactions to...
Jun 1, 2026
U
urbanclient
replied to the thread
RapidTO: Master Thread
.
^That's what I mean, with the 2027/8+ streetcar improvements, including stop removals, stronger TSP, speed limit lifting, and switches...
Jun 1, 2026
U
urbanclient
reacted to
Voltz's post
in the thread
Sheppard Line 4 Subway Extension (Proposed)
with
Like
.
The outer platforms structure for Line 1 is there, but only under the structure that was built for the Sheppard line station, it would...
Jun 1, 2026
U
urbanclient
reacted to
Voltz's post
in the thread
Sheppard Line 4 Subway Extension (Proposed)
with
Like
.
There were side platforms roughed in for Line 1 under the Line 4 station structure, you can see it through vents in the wall of the...
Jun 1, 2026
U
urbanclient
reacted to
T3G's post
in the thread
TTC: Other Items (catch all)
with
Like
.
Any. Small towns don't have the ridership levels that require all door boarding. We do. It needed to be implemented years ago.
Jun 1, 2026
U
urbanclient
reacted to
Richard White's post
in the thread
TTC: Other Items (catch all)
with
Like
.
Desmond Cole has been kooked for years. He's just trying to find another soapbox.
Jun 1, 2026
U
urbanclient
replied to the thread
RapidTO: Master Thread
.
I think ball park ~18 km/h should be possible on Bathurst from Fleet to Bathurst Station. ~10 km/h in traffic is a first step, and...
Jun 1, 2026
U
urbanclient
reacted to
duffo's post
in the thread
RapidTO: Master Thread
with
Like
.
It may feel reasonable, but it equates to a speed of 10 km/h, which is not exactly something to be proud of. I find that the density of...
Jun 1, 2026
U
urbanclient
replied to the thread
RapidTO: Master Thread
.
That's a good first step, but it seems the streetcar is still running slower than scheduled. (The schedule is often padded as it is)...
Jun 1, 2026
U
urbanclient
replied to the thread
GO Transit Electrification | Metrolinx
.
I was thinking 2040 to 2050 for the core ~260 km GO Expansion. So 15 to 25 years from today. 30 to 50 years from today for the tracks...
Jun 1, 2026
U
urbanclient
reacted to
Mihairokov's post
in the thread
Toronto
Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited
with
Like
.
OT: Had the chance to take the Elizabeth Line from Heathrow into London last week. Felt equivalent to UP Express in its ability to get...
Jun 1, 2026
U
urbanclient
reacted to
kEiThZ's post
in the thread
PM Mark Carney's Canada
with
Like
.
@Northern Light On an issue that we have discussed. Some mainstream coverage...
Jun 1, 2026
U
urbanclient
reacted to
Sauga89's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Angry
.
There are also several other procurement lists on Metrolinx's documents page that were posted today. At first glance, the only other...
Jun 1, 2026
Members
Back
Top