  1. Space Gary

    Toronto Toronto | Pinnacle Lakeside Phase 2 | 226.35m | 70s | Pinnacle | Hariri Pontarini

    Might not be the greatest of renders, but I feel like this is a pretty lousy design from HPA (at least compared to their other work).
  2. Space Gary

    Toronto Toronto | The Yards | 133.5m | 39s | TAS | Giannone Petricone

    A lackluster GO train pic, but they've been doing earthworks at the site for the past 1-2 months and now looks like some drill rigs are at work.
  3. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Looks like the first shield section of the TBM is in the shaft, great progress.
  4. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Sure is! Those are the first couple of gantries that make up the TBM, they house all the ancillary equipment like electrical cabinets, ventilation boosters, hydraulic pumps, etc. And that star-shaped thing at the front of the shaft isn't part of the TBM unfortunately, that would be part of the...
  5. Space Gary

    Toronto Toronto | Eglinton Line 5 + GO: Caledonia Station | 11.72m | 2s | Metrolinx | McCallum Sather

    Pedestrian tunnel sections going in this afternoon.
  6. Space Gary

    GO Transit: Construction Projects (Metrolinx, various)

    Bowie Avenue pedestrian tunnel going in at Caledonia station this afternoon.
  7. Space Gary

    GO Transit: Construction Projects (Metrolinx, various)

    What's the work that's happening here for? I saw it when I rode the Barrie line a few weeks ago and was wondering what was going on
  8. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Thanks for the awesome shots (as always) Kotsy!
  9. Space Gary

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    Looks like work has officially begun on the launch shaft! https://www.linkedin.com/posts/north-end-connectors-nec_northendconnectors-nec-yongenorthsubwayextension-activity-7394099995651538945-6rsf?utm_source=share&utm_medium=member_desktop&rcm=ACoAADWJa6MBAZKL-GaYC8sFEQ6H1RVHBql-1T8
  10. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Looks like TBM delivery will be starting at the end of this month, nice to finally see some progress there. Link to notice
  11. Space Gary

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    First panel facing King Street is up!
  12. Space Gary

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    Level 3 is up! Taken this morning.
  13. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    I wonder why the new crane is so tall, why would you need that kind of height to simply lift things in and out of a shaft?
  14. Space Gary

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Likely not. Maybe a couple portions of the shield will be assembled prior to delivery to the site but most will remain as they were unloaded from the ship (including the cutterhead as seen in the photo)
  15. Space Gary

    Toronto Toronto | Islington Station Redevelopment | 7.85m | 1s | TTC | AECOM

    Anyone in the area who can provide an update or pictures of the site as of late?