Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
PShells
reacted to
yurt2022's post
in the thread
TTC: Scarborough Busway Construction (portion of the former Scarborough RT route)
with
Like
.
Well, it seems like the actual construction is going to take less than a year to complete as paving is basically done across the ROW...
Jun 18, 2026
PShells
reacted to
reaperexpress's post
in the thread
GO Transit Electrification | Metrolinx
with
Like
.
The fleet strategy is one of the things that Metrolinx hired ONxpress Operations Inc (DB, Alstom etc) to plan in January 2024. As we...
Jun 18, 2026
PShells
reacted to
smallspy's post
in the thread
GO Transit Electrification | Metrolinx
with
Like
.
Considering the protracted development process that these units have required - not to mention the incredible cost - I would really much...
Jun 18, 2026
PShells
reacted to
Allandale25's post
in the thread
GO Transit Electrification | Metrolinx
with
Like
.
Jun 18, 2026
PShells
reacted to
nfitz's post
in the thread
GO Transit Electrification | Metrolinx
with
Like
.
If GO fares from Union to Appleby were to become over $100 to match what we seemed to see in that Tokyo to Kyoto service over the same...
Jun 18, 2026
PShells
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
Another contributing factor to the fourth track being pushed further out than I originally expected is the originally laid fourth track...
Jun 18, 2026
PShells
reacted to
crs1026's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
Just speculating, but I would guess tha the new fourth track (which will eventually be Track 1 in railway nomenclature) is not coming...
Jun 18, 2026
PShells
reacted to
smallspy's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
Right....but there's no breakdown of what those 13 are. We know of the 7 other GO units to be cycled through. We know that ONR had 3...
Jun 17, 2026
PShells
reacted to
smallspy's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
No, it's just begun. 560 was sent up quite a while ago - firstly to provide a prototype for ONR to use for the refurbishment of the...
Jun 17, 2026
PShells
reacted to
lenaitch's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Haha
.
The PQ's current position is 'give us the money', which is not uncommon...
Jun 17, 2026
PShells
reacted to
smallspy's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
There are certain aspects of the wayfinding which are quite good. The maps at the station entries? I agree with you, I'd like to see...
Jun 15, 2026
PShells
reacted to
Allandale25's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
Grimsby GO works starting...
Jun 15, 2026
PShells
reacted to
smallspy's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
This is absolutely a concern. And the problem is that we can't have our cake and eat it too. The options are a huge amount of...
Jun 15, 2026
PShells
reacted to
81-717's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
Midtown (Eg/Y) ain't exactly "suburban".
Jun 15, 2026
PShells
reacted to
thenorth's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
When talking to normies about the Crosstown, their #1 complaint over and over again is station depth and layout. I’ve had multiple...
Jun 15, 2026
Members
Back
Top