Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
PShells
reacted to
TossYourJacket's post
in the thread
TTC: Major Operational Issues (Various)
with
Like
.
This is a thing they are already working on with the second exit program (which was specifically implemented to bring stations up to...
May 24, 2026
PShells
reacted to
Bordercollie's post
in the thread
TTC: Major Operational Issues (Various)
with
Like
.
The fact that it takes 4-5 hours to clean this up probably means they are doing it manually with a mop a bucket. Also if it is found...
May 24, 2026
PShells
reacted to
taylortbb's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
That's the UPX fleet.
May 24, 2026
PShells
reacted to
scottd's post
in the thread
Toronto
Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx
with
Like
.
This will be such a boon for getting around the area especially for those who have mobility issues. I was taking a walk down memory lane...
May 24, 2026
PShells
reacted to
Sqazi's post
in the thread
Toronto
Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx
with
Like
.
I am really glad the city is doing this. It would have made no sense to leave that connection unconnected. Small things like this make a...
May 24, 2026
PShells
reacted to
junctionist's post
in the thread
Toronto
Toronto | Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx
with
Like
.
The SRT was hard to connect with at Kennedy, noisy, and prone to failure in the winter. Now, a dense part of the suburbs with a lot of...
May 24, 2026
PShells
reacted to
hw621's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
Rode the line today. Seems that the speed limits at intersections have been removed as the LRV ran through them pretty fast. There are...
May 24, 2026
PShells
reacted to
SaugeenJunction's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
All TTC run trams. LRT and streetcar.
May 24, 2026
PShells
reacted to
GenerationLee's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
Oh man, that view brings back memories.
May 24, 2026
PShells
reacted to
A 6264's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
You are referring to the pedestrian tunnel connecting the LRT to the bus bays. It is sopping wet with many fans placed along it. I...
May 24, 2026
PShells
reacted to
Amare's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Like
.
I can report the same exact thing at Don Valley station as well, about 5-6 large industrial fans and 3-4 dehumidifiers. Quite the gongshow.
May 24, 2026
PShells
reacted to
Bureaucromancer's post
in the thread
Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)
with
Like
.
Parts of it. We'll see about taking homelessness as a protected class. But the broad strokes of it will stand with only the Section 7...
May 24, 2026
PShells
reacted to
mburrrrr's post
in the thread
GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)
with
Like
.
Friday
May 23, 2026
PShells
reacted to
smallspy's post
in the thread
GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)
with
Like
.
The funny or scary thing - what is going in in the motors is only half of the whole event. There is even more adjustment built into...
May 23, 2026
PShells
reacted to
mburrrrr's post
in the thread
GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)
with
Like
.
I can’t imagine why these switches ever fail and cause delays.
May 23, 2026
Members
Back
Top