    Calgary | East Village Truman Hotel | 24m | 6s | Truman | NORR

    This one has a bp application submitted. The DP has not even started advertising period so you won’t see construction for a while. But there is obviously intent to build.
  2. No_Problem

    Calgary | Plaza | 109m | 33s | Cantiro | GEC

    What, you guys didn’t believe me? Technically an excavator showing on the Friday counts.
  3. No_Problem

    Calgary | Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    The tower will be 3 levels of parkade. New shoring will be provided including underpinning work on the east and south ends of the new tower for the connections to the existing structures.
  4. No_Problem

    Calgary | The Galloway | 37m | 10s | Ayrshire | EFG Architects

    Negative. This one will be a steel frame building above grade, with the exception of the elevator and stair shafts. This is unique to what I would normally see for this tall of a structure
  5. No_Problem

    Calgary | Stampede Station | 277m | 71s | Truman | NORR

    The DP is progressing quickly and there is now an expectation that a building permit application will be submitted by early June pending unforeseen delays. Keep in mind that a DP only needs to pass the advertising period before a partial bp is considered. I would expect to see construction...
  6. No_Problem

    Calgary | Vibe | 51m | 13s | Slokker | Giannone Petricone

    Both permits are issued for North and South library square
  7. No_Problem

    Calgary | Stampede Hotel | 57.5m | 14s | Truman | NORR

    No, they plan on pausing the project during stampede this summer.
  8. No_Problem

    Calgary | Plaza | 109m | 33s | Cantiro | GEC

    Yes I have also been told this, but more specifically that site mobilization is fully scheduled for the first week of May.
  9. No_Problem

    Calgary | Bluestone | 78m | 18s | Amble Ventures | NORR

    The bp application is submitted and it looks exactly like this.
  10. No_Problem

    Calgary | The Sentinel | 24m | 6s | Arlington Street | Jackson McCormick

    Looks like this job site may have struck a water line? https://calgaryherald.com/news/local-news/water-main-break-17th-avenue-businesses
  11. No_Problem

    Calgary | Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    The will be two new high rise towers, eventually. Plus the office conversion. The next tower will be to the south of the current tower they are currently shoring, but this is not in the current phase so timelines are unknown. The northeast portion of this site may be subdivided for future...
  12. No_Problem

    Calgary | East Riverside Project | 52m | 16s | Bucci Developments | Casola Koppe

    This one has a BP application submitted. Looks like both towers in one phase of construction
  13. No_Problem

    Calgary | Stampede Hotel | 57.5m | 14s | Truman | NORR

    Fun fact the street in this photo is owned by the Calgary Stampede. Private road.
  14. No_Problem

    Calgary | Vibe | 51m | 13s | Slokker | Giannone Petricone

    - there will be no new parkade entrance for this phase of construction. You’re right, access to the Vibe parkade will be by removing the knockout panels. - Vibe will have 2 levels of parkade interconnected to the 3 levels from Verve apartments. - if I recall there will be 4 or 5 retail...
  15. No_Problem

    Calgary | Stampede Hotel | 57.5m | 14s | Truman | NORR

    The partial bp and approved dp just happened simultaneously. The work completed until now was not related to the bp.