News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. Milaisacat

    Hamilton Toronto | The Design District 41 | ?m | 31s | Emblem Developments | Arcadis

    Great shots. The failure to bring that brick column down to grade is a hilarious design oversight that I will shake my head about for years to come. It's such a no-brainer that I have to assume it was an error that nobody caught, as opposed to an intentional design choice. Innsertnamehere, I...
  2. Milaisacat

    Hamilton Toronto | 188 Cannon Street East | 106.6m | 33s | Vantage | Arcadis

    Notwithstanding debate around the merit of above-grade vs below-grade parking, if you are going to do above-grade parking, this is how you do it. Source
  3. Milaisacat

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I think they need to hustle on the pole before it gets Part IV designation and we're stuck with it forever. A grim portent of things to come:
  4. Milaisacat

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    We'll be spoiled for room.
  5. Milaisacat

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Notwithstanding the accuracy of the measurement, it's worth taking a look at a reputable (if dated) decibel level chart for context of 80dB: Source: Yale Environmental Health and Safety
  6. Milaisacat

    VIA Rail

    Thanks very much, and that's a great link. This photo, chef's kiss...
  7. Milaisacat

    VIA Rail

    I've noticed at least two of the new Venture trainsets in the Mimico yard are shorter four-car consists (locomotive, two standard cars, and a cab car). Apologies if this has been discussed, but what is the purpose of these shorter trains?
  8. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    Two generations of Northlander.
  9. Milaisacat

    Toronto Toronto | Downsview West District | ?m | ?s | CLC

    This thread is for the Downsview West District. Taxiway West is a different district.
  10. Milaisacat

    Hamilton Toronto | The Design District 41 | ?m | 31s | Emblem Developments | Arcadis

    "Available units range in price from $824,990 to $824,990." Doesn't anyone proofread anything these days? And of all things to overlook, the price range?
  11. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    Ah. Well, they must have changed the track on which it is stored, because it's the first time I've seen it.
  12. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    The first Northlander trainset is at the VIA Mimico yard. I couldn’t take a photo, but it looks great!
  13. Milaisacat

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Now that they have opened the east side of the bollards (adjacent to the Union Station sign), I expect that they will now block off the west side and complete the installation of the bollards to the retaining wall. They couldn't have blocked off everything to do it all at once (though with the...
  14. Milaisacat

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Good news, gang! They’ve installed bollards at Front and York. I think our long national nightmare of ugly concrete blocks may be coming to an end.

Back
Top