    Toronto Toronto | East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    Im curious seeing the bridge progress if it will be the same elevated railway that they showed they are doing at leslieville station or just a continuation of the concrete bridge. Was trying to find more pictures or details similar to what was provided at the leslieville community meetings but...
  2. L

    Toronto Toronto | Ontario Line: Leslieville Station | 15m | 2s | Metrolinx | HDR

    I attended the community meeting they had a few weeks ago and wanted to share what they are saying the construction will look like between now and 2029. A lot of concerns were brought up mainly around safety for pedestrians and bikes with the closures that they are proposing. As well as...