    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    Well, I would advocate better density in the neighbourhood, and I think I didn’t phrase properly in my original comment. I don’t really oppose new condos, some areas need development for sure, I am more concerned with density in certain areas, when there are two many buildings in one block, it...
  2. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    That’s what I meant, but maybe I phrase in a wrong way in my original comment. I’m more concerned on the density issue in certain areas. For example, the potential construction of 111 Peter street, but I think city Toronto has already approved the motion…(there are already three buildings in...
  3. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    I meant there are already lots of buildings in these area like Peter and Richmond street, and it’s unnecessary to have more new buildings in this specific area, I am not saying don’t build any new condos, some areas needs development for sure. After I moved to my current building, there are...
  4. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    Based on my experience before, the initial part (the current process they are doing now) is most disturbing, the actual construction is actually fine, I mean better than drilling lol. We probably live at the same building and I am facing south, so maybe better than your location, and after two...
  5. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    LOL I see, thanks for the reply!!! Though technically, they haven’t started the building part lol, so not breaking the law yet haha. I wish they stop to have more buildings in this area……I used to love this neighbourhood, but recently with all the new buildings I am thinking to leave……or maybe...
  6. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    Hi, I think you said they haven’t got the building permit and how can they start the construction without permit? Sorry I am not familiar with the process and maybe it’s a stupid question haha. Or maybe the TEYCC meeting is to get the permit?
  7. K

    Toronto Toronto | The Pierre | 133.49m | 40s | Kingdom | BDP Quadrangle

    Hi, do you know is Geothermal part of demolition? How long does it take to finish? I live nearby and kind of noisy in early morning….i feel like it’s been a month after they start to remove the building with all the other works…reading through the messages above, sounds like there is no building...
  8. K

    Toronto Toronto | 111 Peter Street | 172.22m | 52s | IA Financial Group | WZMH

    Thank you both for this info @Northern Light @ProjectEnd, then I guess likely the construction will start either 2026 or 2027…if things goes well.
  9. K

    Toronto Toronto | 111 Peter Street | 172.22m | 52s | IA Financial Group | WZMH

    @Northern Light I see, yeah it makes sense. I do see the approval file requires owner to resubmit some documents, copied paste below from the file. I am wondering how they gonna build it lolll, cause normally the construction would fence a space for construction, but this building has limited...
  10. K

    Toronto Toronto | 111 Peter Street | 172.22m | 52s | IA Financial Group | WZMH

    Thank you so much, @Northern Light, actually city council just adopted today with one motion carried from TEYCC, though it’s preliminary decision for now. Do you happen to know, normally, after city council “approves”, will the construction start immediately? I am actually one of the nearby...
  11. K

    Toronto Toronto | 111 Peter Street | 172.22m | 52s | IA Financial Group | WZMH

    Hi, does this mean this proposal will likely be approved as final decision? The TEYCC is the final step? Sorry I am not very familiar with this process…but I think the proposal itself doesn’t make sense at all, there are already four buildings nearby……. Thanks!