  1. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Oh for sure, I wasn't questioning that. Dundas was a pinch point for everyone. Its not surprising to see they had crews working 24/7. Even better that they had dedicated rail crews on site ensuring everything was laid within spec. It would be terrible to see them have to shut down the...
  2. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I believe Metrolinx said it was Transdev.
  3. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Is the raised asphalt lip around the perimeter of track normal? I see in some sections it's level with the road and in some sections it looks almost like a speedbump.
  4. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Lancashire Ln has been reopened, since there is still ongoing work, youre not able to make a left turn into the plaza if youre SB on Hurontario. Firestation track appears to be done with signs on the street saying no u turns and so on. Ray Lawson should reopen sometime soon. The tracks are...
  5. JJTheJetPln

    Collingwood/blue mountain/Wasaga beach road/infrastructure upgrades

    I'm not from the area, so my apologies if my questions are pointed. What are the reasons for doing these infrastructure upgrades?
  6. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Honestly probably. I glossed over documentation, and it seems ML hasn't specified a completion date up til now, so 2028 seems to be most likely given their evasiveness for a date. It more than likely means we're reaching close to substantial completion, so we'll have to see. Lancashire Lane...
  7. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I would love to see Hurontario be paved from Port Credit right up to Steeles / Hurontario in Brampton, but i dont know if that'll ever be in the books.
  8. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    the platform ice melt system is going to be someone riding the LRV's from platform to platform and spreading salt or sand before hopping on the LRV again to the next stop because they can't afford maintenance vehicles.
  9. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I wonder what snow clearing is going to look like when the time comes.
  10. JJTheJetPln

    GO Transit: Construction Projects (Metrolinx, various)

    I had a few photos from a year and a half or more ago where those structures weren't there, but they've been buried by the spirited discussion that this thread sees. However, it really does seem that they move at a pretty slow pace until you take into consideration the ML document you shared...
  11. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    We keep inching closer and closer to the due date. There were two new notices put up for track destressing work between Hurontario/Queensway to Hurontario/Eglinton as well as from Hurontario/407 to Hurontario/Steeles Avenue. Additionally, I was reading an InSauga article where businesses were...
  12. JJTheJetPln

    GO Transit: Construction Projects (Metrolinx, various)

    Here's some new photos of the Heritage Road Layover for your viewing pleasure. Unfortunately I couldn't catch a photo of a train passing by for scale this time. I'll head out in another year or so to see how far along the project is, as this hasn't changed much since I last took photos.
  13. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    They can price in 24/7 operation time in the initial contract, but 9/10 times, that changes and they go over budget because of time frames that may have been negotiated after the initial contract. Sometimes they incur penalties, and chances are they may have incurred a penalty for not reaching...
  14. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    A few photos from my trip through Brampton today. Steeles/Hurontario looking SB Hurontario/Lancashire Ln 7880 Hurontario (Brampton Fire Station 206) County Ct/Superior Court Entrance Hurontario/Ray Lawson Intersection looking WB Hurontario/Ray Lawson looking NB
  15. JJTheJetPln

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I think even ML / Mobilinx knew how ridiculous it would be to close the intersection for that long.