1. C

    Hamilton Toronto | 1107 Main Street West | 50.96m | 15s | IN8 Developments | srm Architects

    Big chunky concrete pour reminiscent of the former church. Strange triangular balconies that seem a bit of a waste of space.
  2. C

    Hamilton 152 King Street West | 41m | 12s | Vrancor + Equal Parts

    One can dream. lol
  3. C

    Hamilton Toronto | 213 King Street West | 94.3m | 30s | Vrancor Development | ZO1

    They have a sorry excuse for some sidewalk open at this point but for over 2 years it has been nothing. I've walked around it whenever I'm there but that's not often. How can they get away with it while other developments shut down a lane of traffic (405 Main w) or a cycle track (the Point) or...
  4. C

    Hamilton Toronto | Television City | 110.14m | 32s | Lamb Dev Corp | a—A

    I'm pretty sure they are going to have to raise the crane one more time to top this out. The north and south facade cladding should begin it's reverse pattern in a storey or two.
  5. C

    Hamilton 152 King Street West | 41m | 12s | Vrancor + Equal Parts

    I could pay my own salary if I just rode my bike around the lower city giving out tickets to vehicles parked illegally in bike lanes or on sidewalks.
  6. C

    Hamilton Toronto | 213 King Street West | 94.3m | 30s | Vrancor Development | ZO1

    I'm so done with this build. It's been 2 1/2 years. As I recall there was no underground parking to add some time. It's just mediocrity on an extended timeline taking up that sidewalk. How long can they drag this out? Anyway it looks like they have begun the insulated metal panels on the grade...
  7. C

    Hamilton Toronto | Television City | 110.14m | 32s | Lamb Dev Corp | a—A

    idk. I count 24 on the eastern tower which would mean 8 more floors. I think they are looking pretty good.
  8. C

    Hamilton Toronto | 325 James Street North | 45.7m | 12s | Core Urban Inc. | Lintack

    That would be the 5th floor slab. The top of the podium.
  9. C

    Hamilton Toronto | 313 Barton Street East | 22m | 8s | CapGap | STAKT

    I won't miss this. I don't think it has been occupied for years.
  10. C

    Hamilton Toronto | St. Paul's Presbyterian Redevelopment | ?m | 30s | Collecdev-Markee

    https://thepublicrecord.ca/2026/06/revised-downtown-hamilton-ymca-rec-centre-larger-residential-smaller-with-only-one-tower/ This proposal has become 1 tower and the YMCA facility has increased from 55,000 square feet to 85,000 square feet. I hope this one can maintain the aesthetics from the...
  11. C

    Hamilton McMaster Innovation Park | ?m | ?s | McMaster University | McCallum Sather

    403 pic. Passenger shot. Also went by on Longwood later and noticed the 1st floor windows are in. Edit. My bad, it's the second floor windows that are installed.
  12. C

    Hamilton Toronto | The Point | 19.25m | 6s | Yoke Group | Lintack

    From today. No complaints about the building but they could have a bit more respect for the "sidewalk" they left. It's narrow to begin with and the fencing is being pushed by stacked pallets and building materials. There is also twisted bits of wire sticking out towards the sidewalk. ugh.
  13. C

    Hamilton Toronto | 1494 Upper Wellington Street | 67.8m | 20s | Valery Homes | KNYMH

    Hmmm, interesting little story about the cemetery. I knew there had to be a good reason but it is always good to walk places you've never been other than in a car. It's such a different experience.

Back
Top