News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. C

    Toronto Toronto | Seneca Polytechnic Health & Wellness Centre | 15m | 3s | Seneca Polytechnic | DIALOG

    Construction well underway as of mid-April 2026. (Mind the reflection of the soccer field dome)
  2. C

    Toronto Toronto | Ontario Line: Queen Station | ?m | ?s | Metrolinx | HDR

    Ongoing track demolition on Queen west of Yonge (taken 05/31/2025)
  3. C

    Toronto Toronto | Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    Wow I’m surprised to hear this. On the massive abandoned/vacant lot or within the TTC property?
  4. C

    TTC Cartography, Signage, and Wayfinding

    Has there been any confirmation on how the line 1/2/4 trains will be updated to display the new lines 5/6 and future expansions? Are they overhauling the LED maps on the T1’s and TR’s or just keeping as-is?
  5. C

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Saw 2 vehicles w the “TRAINING VEHICLE” signage going westbound near sunnybrook park way later than I’ve ever seen, around 9:30pm last night

Back
Top