There's room on the Winchester Sub - CP pulled out the second track this past summer, leaving only a few long sidings. They installed CTC to manage it, and sent the CWR out to improve the MMA/CMQ. If a bypass was needed badly enough, there is room to re-lay that second track, sidings might not...