News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. B

    Relevé | 78+95.5m | 23+29s | Main+Main+Westdale+Centurion | Arcadis IBI

    Yes, all second floor retail has been removed. The elevator is for parking garage access for retail clients.
  2. B

    General Update/Rumour Thread

    Big real estate listing coming out soon for the parking garage at 41 George including the storefronts along ByWard Market Square. A few developers are already licking their chops.
  3. B

    Neighbourhood - ByWard Market

    Big real estate listing coming out soon for the parking garage at 41 George including the storefronts along ByWard Market Square. A few developers are already licking their chops.
  4. B

    Relevé | 78+95.5m | 23+29s | Main+Main+Westdale+Centurion | Arcadis IBI

    That's an outdated plan. The only parking garage access for the three towers is on Slater in Tower B. Albert St. has a loading dock for Tower A, the Renaissance loading dock is located as per the outdated plan.
  5. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    You are correct. These renderings are outdated including the Tower B for Releve. The total glass tower renderings would have been great but that is a another other story on why it changed. The floor count is not accurate as well. I assume you were the individual who inquired to Summit about...
  6. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    The precast panels are not being covered. Here are a couple accurate elevations.
  7. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    Just going to provide a little insight as the last few comments are not really accurate in terms of quality and cheapness, plus I have an interest in all three of these towers with factual information. The quality of precast is greater than metal siding/panels and cost significantly more than...
  8. B

    Odenak | 665 Albert St. | 105+123.7m | 31+36s | Dream+Multifaith | Perkins&Will+KPMB+Two Row | U/C

    It is moving fast but it has been 1 floor per week for this build. It's been 17 weeks since the first level of the 'tower portion'
  9. B

    General Update/Rumour Thread

    Unfortunately I do not have any updates on that project. I own a consulting company who works with multiple developers (high-rise projects) offering project management services from pre-construction to completion. We do not use or post our tenders on any sites as we invite our preferred...
  10. B

    General Update/Rumour Thread

    Wrong again. I should be able to share it by Friday.
  11. B

    General Update/Rumour Thread

    That’s not correct at all. I cannot name the architect at this point but you guys can put the math together and figure it out. If you don’t, it will be public shortly.
  12. B

    General Update/Rumour Thread

    Here is a sneak peak of the 275 Rideau project (LCBO King Edward & Rideau) It is a major improvement from the first design. This is being proposed at 28 floors at 85m in height, L-Shaped tower with commercial space fronting Rideau St.
  13. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    I can dig some up. Once I do, I will share. Designer for the hotel portion interior is Design Agency.
  14. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    No, there are no open areas in this one. They wanted to maximize the second level board/meeting rooms for this location. This Renaissance will actually be the first in their new design for this brand. High end finishes, lots of millwork and fancy ceilings in the lobby and restaurant areas...
  15. B

    Renaissance Marriot / OROS Apartments | 395 Slater St. | 118m | 36s | Rimap | IBI+GeigerHuot | U/C

    No retail in this building. Hotel has a full service restaurant & bar.

Back
Top