News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

  1. A

    Toronto Nathan Phillips Square + Spirit Garden | ?m | ?s | City of Toronto

    My piece: https://www.theglobeandmail.com/gift/90421fe8336a64eba31e25ebdc75907f58944e66d4620d38c666cff8f6a94599/W6BPITUNYZE67BROW2DUEBNTM4/
  2. A

    Toronto Toronto | East Harbour | 214.2m | 65s | Cadillac Fairview | Adamson

    Now AS+GG. From a presentation at CTBUH: https://bsky.app/profile/alexbozikovic.bsky.social/post/3m2nmcgf4qc2j
  3. A

    Toronto Toronto | 350 Bloor East | 209.07m | 63s | Osmington Gerofsky | Hariri Pontarini

    If the city upzoned, and was able to reliably defend that zoning at the tribunal, many things would change. What would that process look like? Meanwhile, can the city start locking in the key design aspects of proposals to avoid the bait and switch that we get almost every time?
  4. A

    Toronto Toronto | Rees Park Playground and Pavillion | ?m | ?s | Waterfront Toronto

    It’s a fair point, and Metrolinx has much to answer for, but the current plan for Ordinance Triangle Park is abysmal. There’s still room to put a pool here. Instead…
  5. A

    Toronto Toronto | Rees Park Playground and Pavillion | ?m | ?s | Waterfront Toronto

    It makes no sense. The, Claude Cormier plan for ordnance triangle could’ve been built for far less money, and it would instantly have become a landmark in the city. Another wasted opportunity.
  6. A

    Toronto Toronto | Rees Park Playground and Pavillion | ?m | ?s | Waterfront Toronto

    An aquatic centre will cost something like $75-million. (The Davisville one was budgeted at $60-million.) There are already three public rec centres with pools within 3 km of this spot: 1 Yonge, East Bayfront, and St. Lawrence, which is not busy. Lake swimming will be available at the...
  7. A

    120 Bloor East (?, ?s, ?)

    The firm Marani & Morris evolved into RDH and along the way they did the rear addition too.
  8. A

    Toronto Toronto | 505 University | 217.56m | 63s | Cartareal Corp | BDP Quadrangle

    GBCA is claiming that all the limestone cladding panels will need to be removed over time, so the building may as well get torn down. 🤷‍♂️
  9. A

    Toronto Toronto | 40 Walmer | 86.65m | 25s | Princess Management | Turner Fleischer

    This is horrendous. Much worse than the previous iteration. No sense of proportion, no relationship to the formal or material language of the neighbourhood or the city. And a terrible composition. Why are all the condo production firms leaning into these overscaled, glitchy cladding elements...
  10. A

    Toronto Toronto | Danforth Baptist Church Redevelopment | 28m | 8s | Assembly Corp | McCallum Sather

    Bricks: saved. https://www.instagram.com/share/_kstVgPBm
  11. A

    Toronto Toronto | 425 Bloor West | 105.4m | 30s | The Brown Group | Arcadis

    In 50 years, people are going to wonder why there are four extremely ugly res towers at this very prominent intersection.
  12. A

    Toronto Toronto | 1730 Bloor Street West | 89.9m | 25s | HPP LP | RAW Design

    Why are there five different cladding designs in the first eight storeys?

Back
Top