Vita on the Lake share |
tweet |
share |
4 renderings
|
Vita is a 53-storey waterfront condominium overlooking Lake Ontario, Downtown Toronto, and the natural surroundings of the Humber Bay Park. The building, one of two planned for the site, will offer residents a wide range of suite types from 390 sq. ft. studio to large 2 bedroom plus den suites up to 1,970 sq. ft. The amenities at Vita are impressive and include: full size gym, yoga studio, party room, and lounges. There will also be an outdoor pool and lounge with bbq area.
Although Vita is just minutes away from Downtown, residents will also be able to enjoy the natural surroundings of lakefront parks and trails. Vita is life uncomplicated.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Project Information|
Full data set available with a UTPro subscription
|
|
| Earliest Application Date 0000-00-00 | Construction Status Complete |
| Category Residential (Condo) | Construction Began 0000-00-00 |
| Completion Date 0000-00-00 | |
| Address 70 Annie Craig Dr, Toronto, Canada | Other Addresses XXX XXXXXX XX, XXX XXXXXX XX |
| Latitude XXXXXXXXX | Longitude XXXXXXXXX |
| Region XXXXXX | Ward XX |
| MLS Zone XX | |
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'. XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX |
|
Project Attributes|
Full data set available with a UTPro subscription
|
|
| FAR/FSI XXXXXX | Crane Number XX |
| Site Area XXXXXX XX | Heritage XXX |
| Number of Buildings | |
| Maximum Height 581 ft / 177.08 m | |
| Maximum Storeys 53 | |
| Underground Levels X | |
Project Companies| Developer Mattamy Homes, Biddington Group |
| Builder Mattamy Homes |
| Architect Graziani + Corazza Architects |
| Landscape Architect gh3 |
| Interior Designer U31 |
| Engineering Rebar Enterprises Inc, Groundwater Environmental Management Services Inc. (GEMS) |
| Marketing & Press L.A. Inc., tcgpr (The Communications Group) |
| Realtor/Sales Milborne Group |
| Supplier UCEL Inc. |
| Other Peter McCann Architectural Models Inc. |
Units|
Full data set available with a UTPro subscription
|
|
| Total Number Of Units 489 | Total Rental Units XXX |
| Building Units 489 | Hotel Units XXX |
| Market-Rate Rental Units XXX | Freehold Units XXX |
| Condo Units XXX | Other Units XXX |
| Unspecified Tenure Units XXX | Affordable Rental Units XXX |
| Rental Replacement Units XXX | |
Unit Mix|
Full data set available with a UTPro subscription
|
|
| Studios XXX | |
| 1 Bedrooms XXX | |
| 2 Bedrooms XXX | |
| 3+ Bedrooms XXX | |
Gross Floor Area|
Full data set available with a UTPro subscription
|
|
| Total GFA XXXXXX XX | Office GFA XXXXXX XX |
| Commercial GFA XXXXXX XX | Residential GFA XXXXXX XX |
| Industrial GFA XXXXXX XX | Retail GFA XXXXXX XX |
| Institutional GFA XXXXXX XX | |
Parking|
Full data set available with a UTPro subscription
|
|
| Total Vehicular Parking XXX | Office Parking XXX |
| Residential Parking XXX | Industrial Parking XXX |
| Visitor Parking XXX | Institutional/Other Parking XXX |
| Retail Parking XXX | |
| Bike Parking XXX | |
Access and Services|
Full data set available with a UTPro subscription
|
|
| Road Access XXXXXX XXXXXX | Mass Timber XXX |
| Municipal Water XXXXXX XXXXXX | Green Standards XXXXXX |
| Municipal Sanitary Sewers XXXXXX XXXXXX | LEED Certified XXXXXX |
| Municipal Storm Sewers XXXXXX XXXXXX | Passive Home Certified XXX |
| Other (Septic) XXXXXX XXXXXX | |
Minimum Setbacks|
Full data set available with a UTPro subscription
|
|
| Front Lot Line Direction X | Side Lot Line 1 Direction X |
| Front Lot Line Existing XXXXXX | Side Lot Line 1 Existing XXXXXX |
| Front Lot Line Proposed XXXXXX | Side Lot Line 1 Proposed XXXXXX |
| Rear Lot Line Direction X | Side Lot Line 2 Direction X |
| Rear Lot Line Existing XXXXXX | Side Lot Line 2 Existing XXXXXX |
| Rear Lot Line Proposed XXXXXX | Side Lot Line 2 Proposed XXXXXX |
Applications|
Full data set available with a UTPro subscription
|
|
| Primary Approval XXX | |
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX |
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX |
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX |
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX |
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX |
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX |
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX |
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX |
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX |
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX |
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX |
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX |
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX |
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX |
|
Permits|
Full data set available with a UTPro subscription
|
Links|
Full data set available with a UTPro subscription
|
|
| Website XXXXXXXXXXXXXXXXXX | Registration XXXXXXXXXXXXXXXXXX |
| Email info.gta.highrise@mattamycorp.com | Social Media XXXXXXXXXXXXXXXXXX |
| Other XXXXXXXXXXXXXXXXXX | |
Documents
|
||||||||||||
Forum
|
Buildings Discussion |
| Views: 102K | Replies: 274 | Last Post: Feb 26, 2022 |
|
Real Estate Discussion |
| Views: 4.9K | Replies: 7 | Last Post: Dec 10, 2021 |
Member Photos 

![]() | 199 photos |
|
23K 


