
U of T: Landscape of Landmark Quality
14 renderings
U of T: Landscape of Landmark Quality:
The consortium of KPMB Architects, Michael Van Valkenburgh Associates (MVVA) and Urban Strategies developed the winning proposal to restore and beautify the central spaces of the University of Toronto’s historic St. George campus. As a major initiative of the University of Toronto and one of the largest landscape infrastructure projects in Canada in our time, the vision is to transform 20 acres comprising four landmark spaces that define the historic downtown campus.
The concept establishes a framework to guide the future evolution of the campus as a pedestrian-friendly realm and to restate the fundamental role of green space as a factor of academic excellence. A car-free necklace of meandering, interwoven paths is proposed to animate King’s College Circle and a stately column of oak trees around Tower Road are two key strategies in the reimagining of four landmark green spaces that define the university’s campus: King’s College Circle, Hart House Circle, Sir Daniel Wilson Quad and the Back Campus Fields.
A priority is to restrict vehicular traffic and remove all at-grade parking while increasing space for bicycles. A major underground arrivals court for people arriving by car is located under King’s College Circle and forms a major component in the vision to create a pedestrian-friendly realm.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Full data set available with a UTPro subscription
|
|
Earliest Application Date
0000-00-00
|
Construction Status
Complete
|
|
Category
Institutional, Public Space / Park
|
Construction Began
0000-00-00
|
|
|
Completion Date
0000-00-00
|
|
Address
24 King's College Crcl, Toronto, M5S 1A1, Canada
|
Other Addresses
XXX XXXXXX XX, XXX XXXXXX XX
|
|
Latitude
XXXXXXXXX
|
Longitude
XXXXXXXXX
|
|
Region
XXXXXX
|
Ward
XX
|
|
MLS Zone
XX
|
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
|
Full data set available with a UTPro subscription
|
|
FAR/FSI
XXXXXX
|
Crane Number
XX
|
|
Site Area
XXXXXX XX
|
Heritage
XXX
|
|
Number of Buildings
1
|
|
|
Maximum Height
0 ft / 0 m
|
|
|
Maximum Storeys
1
|
|
|
Underground Levels
X
|
|
Full data set available with a UTPro subscription
|
|
Total Number Of Units
|
Total Rental Units
XXX
|
|
Building Units
|
Hotel Units
XXX
|
|
Market-Rate Rental Units
XXX
|
Freehold Units
XXX
|
|
Condo Units
XXX
|
Other Units
XXX
|
|
Unspecified Tenure Units
XXX
|
Affordable Rental Units
XXX
|
|
|
Rental Replacement Units
XXX
|
Full data set available with a UTPro subscription
|
|
Studios
XXX
|
|
|
1 Bedrooms
XXX
|
|
|
2 Bedrooms
XXX
|
|
|
3+ Bedrooms
XXX
|
|
Full data set available with a UTPro subscription
|
|
Total GFA
XXXXXX XX
|
Office GFA
XXXXXX XX
|
|
Commercial GFA
XXXXXX XX
|
Residential GFA
XXXXXX XX
|
|
Industrial GFA
XXXXXX XX
|
Retail GFA
XXXXXX XX
|
|
Institutional GFA
XXXXXX XX
|
|
Full data set available with a UTPro subscription
|
|
Total Vehicular Parking
XXX
|
Office Parking
XXX
|
|
Residential Parking
XXX
|
Industrial Parking
XXX
|
|
Visitor Parking
XXX
|
Institutional/Other Parking
XXX
|
|
Retail Parking
XXX
|
|
|
|
Bike Parking
XXX
|
Full data set available with a UTPro subscription
|
|
Road Access
XXXXXX XXXXXX
|
Mass Timber
XXX
|
|
Municipal Water
XXXXXX XXXXXX
|
Green Standards
XXXXXX
|
|
Municipal Sanitary Sewers
XXXXXX XXXXXX
|
LEED Certified
XXXXXX
|
|
Municipal Storm Sewers
XXXXXX XXXXXX
|
Passive Home Certified
XXX
|
|
Other (Septic)
XXXXXX XXXXXX
|
|
Full data set available with a UTPro subscription
|
|
Front Lot Line Direction
X
|
Side Lot Line 1 Direction
X
|
|
Front Lot Line Existing
XXXXXX
|
Side Lot Line 1 Existing
XXXXXX
|
|
Front Lot Line Proposed
XXXXXX
|
Side Lot Line 1 Proposed
XXXXXX
|
|
|
|
|
Rear Lot Line Direction
X
|
Side Lot Line 2 Direction
X
|
|
Rear Lot Line Existing
XXXXXX
|
Side Lot Line 2 Existing
XXXXXX
|
|
Rear Lot Line Proposed
XXXXXX
|
Side Lot Line 2 Proposed
XXXXXX
|
Full data set available with a UTPro subscription
|
|
Primary Approval
XXX
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX
|
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
Full data set available with a UTPro subscription
|
Full data set available with a UTPro subscription
|
|
Website
XXXXXXXXXXXXXXXXXX
|
Registration
XXXXXXXXXXXXXXXXXX
|
|
Email
|
Social Media
XXXXXXXXXXXXXXXXXX
|
|
Other
XXXXXXXXXXXXXXXXXX
|
|
Full data set available with a UTPro subscription
|
XXXXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXX-XX-XX |
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX |
XXXXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXXXXXXX-XX-XX |
XXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX |
|
|
|
|
Views: 139K | Replies: 428 | Last Post: Mar 02, 2026
|
 | 439 photos |