
Pickering GO Pedestrian Bridge
11 renderings
Construction is underway on Pickering’s landmark pedestrian bridge. The extended steel span will be installed in March, with the full completion expected by this fall. It could not be more appropriate that Pickering’s Bicentennial year of 2011 will mark the advent of its iconic and figurative bridge to the future.
This fully enclosed bridge will span 250 metres across Highway 401, Canada’s busiest highway, and will be accessible to both pedestrians and cyclists. Additionally, it will link the Pickering GO station to a newly constructed Class ‘A’, LEED-Silver office tower and a 500-vehicle GO Transit parking deck located on the south lands of the Pickering Town Centre.
The federal and provincial governments are financing $10 million of the project through the Infrastructure Stimulus Fund. Metrolinx is making a further investment of $12.5 million so that the bridge can truly become an icon of engineering and sustainability.
It should also be noted that the bridge will be a study in design. The structure will be wrapped in a metallic, mesh-like skin, giving it a fluidic and organic appearance. LED lighting will illuminate the bridge at night, making it a luminous beacon that will signify where Pickering and Durham Region begin.
Pickering’s downtown has been designated an ‘Anchor Hub’ by the Province of Ontario. As such, this multi-million dollar structure will play a significant role in connecting the City to other key transportation networks, and will serve as a catalyst towards downtown Pickering’s dramatic transformation.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Full data set available with a UTPro subscription
|
|
Earliest Application Date
0000-00-00
|
Construction Status
Complete
|
|
Category
Transit, Public Space / Park
|
Construction Began
0000-00-00
|
|
|
Completion Date
0000-00-00
|
|
Address
Pickering GO Station, Pickering, Canada
|
Other Addresses
XXX XXXXXX XX, XXX XXXXXX XX
|
|
Latitude
XXXXXXXXX
|
Longitude
XXXXXXXXX
|
|
Region
XXXXXX
|
Ward
XX
|
|
MLS Zone
XX
|
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
|
Full data set available with a UTPro subscription
|
|
FAR/FSI
XXXXXX
|
Crane Number
XX
|
|
Site Area
XXXXXX XX
|
Heritage
XXX
|
|
Number of Buildings
1
|
|
|
Maximum Height
0 ft / 0 m
|
|
|
Maximum Storeys
0
|
|
|
Underground Levels
X
|
|
Full data set available with a UTPro subscription
|
|
Total Number Of Units
|
Total Rental Units
XXX
|
|
Building Units
|
Hotel Units
XXX
|
|
Market-Rate Rental Units
XXX
|
Freehold Units
XXX
|
|
Condo Units
XXX
|
Other Units
XXX
|
|
Unspecified Tenure Units
XXX
|
Affordable Rental Units
XXX
|
|
|
Rental Replacement Units
XXX
|
Full data set available with a UTPro subscription
|
|
Studios
XXX
|
|
|
1 Bedrooms
XXX
|
|
|
2 Bedrooms
XXX
|
|
|
3+ Bedrooms
XXX
|
|
Full data set available with a UTPro subscription
|
|
Total GFA
XXXXXX XX
|
Office GFA
XXXXXX XX
|
|
Commercial GFA
XXXXXX XX
|
Residential GFA
XXXXXX XX
|
|
Industrial GFA
XXXXXX XX
|
Retail GFA
XXXXXX XX
|
|
Institutional GFA
XXXXXX XX
|
|
Full data set available with a UTPro subscription
|
|
Total Vehicular Parking
XXX
|
Office Parking
XXX
|
|
Residential Parking
XXX
|
Industrial Parking
XXX
|
|
Visitor Parking
XXX
|
Institutional/Other Parking
XXX
|
|
Retail Parking
XXX
|
|
|
|
Bike Parking
XXX
|
Full data set available with a UTPro subscription
|
|
Road Access
XXXXXX XXXXXX
|
Mass Timber
XXX
|
|
Municipal Water
XXXXXX XXXXXX
|
Green Standards
XXXXXX
|
|
Municipal Sanitary Sewers
XXXXXX XXXXXX
|
LEED Certified
XXXXXX
|
|
Municipal Storm Sewers
XXXXXX XXXXXX
|
Passive Home Certified
XXX
|
|
Other (Septic)
XXXXXX XXXXXX
|
|
Full data set available with a UTPro subscription
|
|
Front Lot Line Direction
X
|
Side Lot Line 1 Direction
X
|
|
Front Lot Line Existing
XXXXXX
|
Side Lot Line 1 Existing
XXXXXX
|
|
Front Lot Line Proposed
XXXXXX
|
Side Lot Line 1 Proposed
XXXXXX
|
|
|
|
|
Rear Lot Line Direction
X
|
Side Lot Line 2 Direction
X
|
|
Rear Lot Line Existing
XXXXXX
|
Side Lot Line 2 Existing
XXXXXX
|
|
Rear Lot Line Proposed
XXXXXX
|
Side Lot Line 2 Proposed
XXXXXX
|
Full data set available with a UTPro subscription
|
|
Primary Approval
XXX
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX
|
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
Full data set available with a UTPro subscription
|
Full data set available with a UTPro subscription
|
|
Website
XXXXXXXXXXXXXXXXXX
|
Registration
XXXXXXXXXXXXXXXXXX
|
|
Email
|
Social Media
XXXXXXXXXXXXXXXXXX
|
|
Other
XXXXXXXXXXXXXXXXXX
|
|
Full data set available with a UTPro subscription
|
XXXXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXX-XX-XX |
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX |
XXXXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXXXXXXX-XX-XX |
XXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX |
|
|
|
|
Views: 67K | Replies: 145 | Last Post: Dec 05, 2025
|
 | 10 photos |